国产福利91精品一区二区三区-成人网战-岛国av在线播放-毛片久久久-国产精品美女久久久-日韩av不卡在线-男女瑟瑟视频-午夜影院免费观看-色福利视频-亚洲欧美国产视频-国产视频四区-神宫寺奈绪一区二区三区-男人天堂导航-亚洲国产精彩视频-男同毛片

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

No.07 SD20 Rotary Drill construct in XiLong Jobsite

2009-07-07

Recently, in XiLong hydro junction jobsite, Hubei province, one unit SD20 which had worked for 6000 hours has set the new record in foundation piles.

 

XiLong hydro junction started in Feb, 2009 is the major national project, which is located in HuBei province. One of important projects is to establish a bridge on old riverbed. It is difficult with high pile requirements. The pile should be 1.5m Dia and 55m Dep. The situation of the old riverbed is complicated, and alternative allocated with clay, fine sand, and locked clay from 0-30m, below 30m, there is big and hard cobble layer.


When SD20 applied to the project, it finish a 55m depth and 1.5 dia pile with 8 hours, high efficiency and precision is praised by the projects owner. This SD20 had worked more than 6000 hours since may, 2006. The excellent performance has greatly proved the quality of our machines.

Now, this project is under way, SD20 and SG40A, SG40E worked there day and night to contribute to the national infrastructure projects.